Subscribe to news
News archive

News

Drilling crew №1 оf PNG Drilling Co has begun works at the production site in Astrakhan

05.08.2011

On August 02-nd, 2011 the  drilling crew №1 оf  PNG Drilling Co  has begun works on the preparing the mobile drilling rig «Pobedit  4000 / WEI DS 205» for the  mobilization from the production site in Astrakhan to the Urtovskoe oil field, located on the North of the Astrakhan region.

These works have been realized under the agreement, signed with the operator- subsurface user LLC «Vyazovskoe» for the drilling of three wells at Urtovskoe oil field. The inspection of the technical condition of the drilling rig,  previously made  by demand of LLC «Vyazovskoe»  with the participation of the drilling rig manufacturer’s representative ( WEI S.r.I. Italy),  confirmed  the full readiness of PNG Drilling Co drilling equipment  for carrying out the forthcoming  drilling works. The first well drilling is scheduled for September 2011.

Up