News
Drilling crew №1 оf PNG Drilling Co has begun works at the production site in Astrakhan
On August 02-nd, 2011 the drilling crew №1 оf PNG Drilling Co has begun works on the preparing the mobile drilling rig «Pobedit 4000 / WEI DS 205» for the mobilization from the production site in Astrakhan to the Urtovskoe oil field, located on the North of the Astrakhan region.
These works have been realized under the agreement, signed with the operator- subsurface user LLC «Vyazovskoe» for the drilling of three wells at Urtovskoe oil field. The inspection of the technical condition of the drilling rig, previously made by demand of LLC «Vyazovskoe» with the participation of the drilling rig manufacturer’s representative ( WEI S.r.I. Italy), confirmed the full readiness of PNG Drilling Co drilling equipment for carrying out the forthcoming drilling works. The first well drilling is scheduled for September 2011.